blumeops/docs/reference/infrastructure/power.md
Erich Blume e5d1e979b8 Add power infrastructure reference card (#138)
## Summary
- New `power.md` reference card documenting the full power chain: AC grid → Anker SOLIX F2000 battery → CyberPower CP1000PFCLCD UPS → homelab
- Lists all devices on the UPS (indri, sifaka, UniFi Express 7, Starlink)
- Replaced inline UPS entry on indri card with link to the new power card
- Added power card to reference index

Context: power chain was upgraded — the Anker battery station now sits between grid power and the UPS, providing extended runtime for grid outages.

## Test plan
- [x] docs-check-links, docs-check-index, docs-check-filenames all pass

🤖 Generated with [Claude Code](https://claude.com/claude-code)

Reviewed-on: https://forge.ops.eblu.me/eblume/blumeops/pulls/138
2026-02-09 23:03:13 -08:00

35 lines
787 B
Markdown

---
title: Power
tags:
- infrastructure
---
# Power Infrastructure
The homelab runs on battery-backed power to survive grid outages.
## Power Chain
```
AC Grid (120V) → Anker SOLIX F2000 → CyberPower CP1000PFCLCD → Homelab
```
| Stage | Device | Notes |
|-------|--------|-------|
| **Grid** | 120V AC mains | Charges the battery station |
| **Battery** | Anker SOLIX F2000 GaNPrime | 2048Wh portable power station |
| **UPS** | CyberPower CP1000PFCLCD | 1000VA / 600W, pure sine wave output |
## Devices on UPS
| Device | Role |
|--------|------|
| [[indri]] | Primary server |
| [[sifaka]] | NAS |
| UniFi Express 7 | WiFi router |
| Starlink | Satellite internet uplink |
## Related
- [[hosts]] - Device inventory
- [[restart-indri]] - Shutdown and startup procedure