generated from eblume/project-template
|
Some checks failed
Build / validate (pull_request) Failing after 5s
Backend is feature-complete; point the trackers at heph.nvim as the next slice so a cold-start session resumes correctly. - AGENTS.md: update the (always-in-context) project-structure block — all three daemon modes + sync + auth are done; CLI gained search/journal/auth; heph.nvim is the next slice. Point at tech-spec §14 as the live tracker. - tech-spec §14: reorder "not yet done" so heph.nvim is #1 (the remaining build slice), with adoption refinement and the dependency-refresh sweep as non-blocking follow-ups. Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com> |
||
|---|---|---|
| .. | ||
| reference.md | ||
| tech-spec.md | ||