generated from eblume/project-template
|
Some checks failed
Build / validate (pull_request) Has been cancelled
The plugin is built, installed, and well past 11a–11c. Record the post-11c UX iteration (managed daemon + self-heal, follow-or-create, home/index, dailies picker, interactive views, dev isolation, fully-Dagger CI) as done, and reset the "not yet done" backlog to lead with the highest-value next work: task-scheduling UX (do-date/late-on/recurrence from the editor), then more surfacing (backlinks/tags/health/log-read), 11d (deferred), and the heph.nvim repo split. Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com> |
||
|---|---|---|
| .. | ||
| heph-nvim.md | ||
| reference.md | ||
| tech-spec.md | ||