generated from eblume/project-template
|
Some checks failed
Build / validate (pull_request) Has been cancelled
Study of the owner's live Todoist (387 tasks, 34 hierarchical projects) grounds a surface-strategy revision: structured task fields suit CLI flags, large-set triage suits an interactive TUI, and context/KB suits nvim — so v1 adopts three surfaces, each to its strength. Supersedes the earlier "heph.nvim is the primary surface" framing. - design.md: new §6.2.1 (Todoist study) + revised §4 (three-surface model) - tech-spec §1/§8: reframe surface roles; new §8.1 (planned heph-tui agenda) - tech-spec §14: reorder remaining work (CLI-complete task surface in progress, heph-tui next, nvim navigation polish, tags/hierarchy deferred) Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com> |
||
|---|---|---|
| .. | ||
| heph-nvim.md | ||
| reference.md | ||
| tech-spec.md | ||