During finalization, all mikado frontmatter (requires, status, branch) should
be removed — cards become plain documentation linked via wiki-links. Updated
agent-change-process docs and cleaned up 10 cards from closed chains. Also
fixed ai-docs referencing deleted plans/ files.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
## Summary
Completes the `upgrade-k8s-runner` mikado chain. Both prerequisites (workflow validation in Dagger, config review against v12 defaults) were resolved in #250.
- Bump runner image `code.forgejo.org/forgejo/runner:6.3.1` → `12.7.0`
- Update `service-versions.yaml` to track new version
- Mark goal card complete (remove `status: active`)
## Deployment and Testing
After merge:
1. `argocd app sync forgejo-runner`
2. Verify runner registers in Forgejo admin → runners
3. Trigger a test workflow (e.g. `branch-cleanup.yaml` manual dispatch)
Rollback: revert image tag to `6.3.1`, push, sync.
Reviewed-on: https://forge.ops.eblu.me/eblume/blumeops/pulls/251
## Summary
- Review runner config against v12.7.0 defaults — added `shutdown_timeout: 3h`, no breaking changes found
- Add `validate_workflows` Dagger function using `forgejo-runner validate --directory .` inside upstream container
- All 6 workflows pass v12.7.0 schema validation
- Wire `mise run validate-workflows` task and pre-commit hook on `.forgejo/workflows/` changes
- Mark both leaf Mikado cards (`review-runner-config-v12`, `validate-workflows-against-v12`) complete
## Mikado State
After merge, `upgrade-k8s-runner` goal card has no unmet dependencies — ready to execute the actual image bump in a follow-up PR.
## Test Plan
- [x] `dagger call validate-workflows --src=.` passes (all 6 workflows OK)
- [x] Pre-commit hooks pass
- [ ] Reviewer: confirm `shutdown_timeout: 3h` addition to ConfigMap looks reasonable
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Reviewed-on: https://forge.ops.eblu.me/eblume/blumeops/pulls/250
## Summary
- C2 Mikado chain for upgrading the k8s forgejo-runner daemon (6 major versions behind)
- Root goal card with two leaf prerequisites: workflow validation and config review
- Ringtail runner is already at ~v12.6.4 via nixpkgs, no work needed there
## Mikado Chain
```
upgrade-k8s-runner (goal)
├── validate-workflows-against-v12 (leaf)
└── review-runner-config-v12 (leaf)
```
Both leaves are actionable now. The biggest risk is workflow schema validation
(introduced in v8/v9) rejecting our existing workflows.
## Next Steps
Work the leaf nodes in a follow-up session, then attempt the goal.
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Reviewed-on: https://forge.ops.eblu.me/eblume/blumeops/pulls/249